Series 25239

Department of Transportation. Communications Division Official photographs: video documentation of construction projects, 1981-

17.60 cubic feet

These records are housed in the Utah State Archives' permanent storage room.

Historical Note

See history of the records' creator.

Summary of Records

The Utah Department of Transportation (UDOT) documents highway construction projects. In addition to still photographs, UDOT photographic services created video documentation from 1985 to 1992. These videos include footage of construction processes. They also document construction progress by driving with a camcorder through the entire length of a project at different time intervals.

Scope and Content

The Utah Department of Transportation (UDOT) documents highway construction projects. In addition to still photographs, UDOT photographic services created video documentation from 1985 to 1992. These videos include footage of construction processes. They also document construction progress by driving with a camcorder through the entire length of a project at different time intervals.
This series documents many interstate freeway construction projects, including projects on I-15, I-215, I-70, and I-80. Through most of the period of documentation UDOT continued work on I-70 which connects Los Angeles to Denver and passes through scenic but desolate areas of central Utah. I-70 was completed as a two lane interstate in 1970, but thereafter Congress increased interstate standards, making four lanes a requirement. I-70 construction projects in the 1980s involved widening I-70 to bring it up to this four lane standard. UDOT pushed construction through Clear Creek Canyon and Richfield (1986),and then continued on to Green River in approximately ten mile stretches through the heart of San Rafael Swell. Construction mileposts include Fremont Junction, Muddy Creek, Devils Canyon, Ghost Rocks, Rattlesnake Bench and Saleratus Wash. I-70 construction includes passage through Spotted Wolf Canyon, where UDOT expanded a natural gorge a few feet wide to accommodate the four lane interstate. UDOT received national recognition for its construction of the Eagle Canyon Bridge which carried I-70 across Eagle Canyon. This series documents bridge construction and also includes footage of a 4wd trail which descends to the bottom of Eagle Canyon.
UDOT videos document similar construction projects on I-80 which crosses the West Desert in Tooele County. Utah's heavy rainfall in the early 1980s caused the Great Salt Lake to rise to record levels. UDOT had to raise I-80 levees around the lake to keep water off the interstate.
Video footage in this collection documents the final phases ofconstruction on I-215, the belt route in Salt Lake City (1986-1987). It also documents extensive landscaping which UDOT completed on the belt route in the early 1990s. UDOT updated sections of I-15 in the Salt Lake City area (1986, 1992), and completed I-15 projects in Box Elder County, from Plymouth to Tremonton (1990), and in Washington and Iron Counties (1992). UDOT improvements on I-15 included construction of a super port of entry in St. George, Utah (1992).
In an attempt to improve the interstate, UDOT resurfaced a section of I-15 near Salt Lake City with a synthetic cement called syncrete (1989-1990). Syncrete proved to be less than the superior surface it was advertised to be, and the freeway surface began crumbling shortly after the project's completion. In the end the UDOT tore out the syncrete and admitted that the experiment had been a failure.
This series documents construction of major thoroughfares in Utah cities. West Valley Highway, renamed Bangerter Highway in1993, (1991) is a major north-south artery which runs the full length of Salt Lake Valley. Washington Boulevard (1992) is a similar artery in Ogden, Utah.
UDOT construction projects documented herein include a number of state roads. Most prominent of these are: State Road 31, through Huntington Canyon, State Road 9 which connects I-15 to U.S. 89 at Mt. Carmel Junction, State Road 313 which links Dead Horse Point with U.S. 191 near Seven Mile Canyon, State Road 276 in the area of Glen Canyon Recreation Area, and State Road 24 which links Salina to Hanksville via Capitol Reef National Park. Documented projects include construction of the San Rafael Bridge (1990) on State Road 24, and construction of a bridge across the Virgin River (1992) on State Road 9 in Washington County.
Video tapes in this series document the construction of a new Dewey Bridge to replace the original Dewey Bridge built in 1916 across the Colorado River near the confluence of the Colorado and Big Dolores Rivers.These video tapes also document the construction of the Jordanelle Dam which continued from 1987 to 1993. The Jordanelle Dam, which is on the Provo River about 10 miles north of Heber City and 40 miles east of Salt Lake City, created Jordanelle Reservoir.
In addition to video tapes documenting construction, this UDOT collection includes aerials of the Colorado River and the Salt Lake Valley, back country shots on the Big Dolores River, the dedication ceremony for the Recapture Wash Dam, shots of petroglyphs and archeological digs, shots of flooding (1986), and a compilation of nightly news reports on syncrete.

Research Note

There are virtually no videos for the year 1987.
Even though there are a few video tapes of earlier and later date, the bulk of documentation in this collection is 1985 to 1993.

Arrangement

Initially alphabetical by subject or name of construction project, and subsequently sequential by job number.

Early video tapes (1985-1987) are arranged alphabetically by subject or name of construction project. Beginning in 1988, the Community Relations Office began identifying tapes by job number and incorporating the video tapes into the general index for official photographs.

Access Restrictions

This series is classified as Public.

Use Restrictions

These records are available for reproduction and use.

Preferred Citation

Cite the Utah State Archives and Records Service, the creating agency name, the series title, and the series number.

Custody History

Video tapes documenting road construction were transferred from the Department of Transportation to Utah State Archives in 2003.

Acquisition Information

These records were acquired from the creating agency through established retention schedules.

Processing Information

The portion of this series which was recorded on video home system VHS tapes was processed by Rosemary Cundiff in January 2004. Prior to the advent of VHS tapes, UDOT used reel to reel video tapes. Some Sixteen boxes of reel to reel tapes which UDOT also transferred in 2003 are currently unevaluated.

Related Material

Upper Colorado River project case files from the Governor Clyde, Series 200, may contain photo and/or video of construction projects related to the Upper Colorado River Storage Project.
Official photographs from the Department of Transportation. Office of Community Relations, Series 24289, contains additional documentation of all construction projects.
Official photographs index from the Department of Transportation. Office of Community Relations, Series 25122, provides reference and additional descriptive information about the videos in this series.

Container List

ReelFolderDescription
11Antelope Island borrow pit and conveyor, Aug 1979-Nov 1981
12Capitol Reef in rain and sand storm and launching John Atlantic Burr (no date)
13Colorado River aerials, 14 April 1986
14Dewey Bridge construction, new structure over Colorado River, 5 Feb 1986
15Dewey Bridge, road Sisco to Dewey Bridge, road bridge to Moab, Clayhill pictographs, 28 Apr 1986.
16Dewey Bridge construction, 21 May 1986
17Dewey Bridge, removal of barricades from old bridge, petroglyphs near Dewey, 12 Aug 1986
18Dewey Bridge construction, 15 Jul 1986, 16 Jul 1986, and 2 Sep 1986
19Flooding in Weber Canyon, 18 Feb 1986; Flooding Ogden Canyon, 20 Feb 1986; Flooding I-80 Great Salt Lake, 24 Feb 1986.
110Indian digging in Huntington Canyon, 20 Oct 1986 & 4 Nov 1986.
111Interstate-15 closing and preconstruction at 7200 South, 28 Jul 1986
112Interstate-15 at 7200 South, bridge deck repair, undated
113Interstate-15 at 7200 South, bridge repair and shots of completed road, 15 Oct 1986
114Interstate-15 North of Beaver, 11 Sep 1986
115Interstate-15, Malad River to Plymouth, Sep 10 1985
116Interstate-15, Malad River (85-213).
117Interstate-15, Malad River, Tremonton to Plymouth, 6 Jun 1986
118Interstate-15, Tremonton to Plymouth, north end of project, 7 Nov 1986, 13 Mar 1987
119Interstate-215 shoulder wall drilling, no date
120Interstate-215 east of 11th East, 28 Aug 1986.
21Interstate-215 general construction, day before dedication; 31 Jul 1985 & 3 Dec 1986.
22Interstate-215, first beams of large structure being brought into place, 15-17 Dec 1986.
23Interstate-215 construction; 7200 South and Murray, 11 Dec 1986; lifting last connecting beams over 20th East, 11 Jan 1987
24Interstate-215 east of 11th east; cement plant set up and laydown machine, 27 Feb 1987, 7 Jul 1987, 9 Jul 1987
25Interstate-215 rain on new pour, 11 Aug 1987
12Interstate-70 construction through Clear Creek Canyon, including shots of petroglyphs, no date
115Interstate-70 Richfield South, Sep 16, 1985
26Interstate-70 over U.S. 89, 13 Mar 1986 to 12 Sep 1986
27Interstate-70 construction of overpass over U89 and general construction from Salina to Sigard, Mar 1986
28Interstate-70 archeological digs, 10 Apr 1986
15Interstate-70 over 89, I-70 to Salina; I-70 South of Richfield, 28 Apr 1986
29Interstate-70 South of Richfield construction, 28 May 1986
210Interstate-70 South of Richfield, 17 Jul 1986, 14 Aug 1986; I-70 crossing 89, 17 Jul 1986, 14 Aug 1986
17Interstate-70 asphalt laydown, Aug 1986
211Interstate-70 aerials of construction Salina to Elsinore, 13 Sep 1986
212Interstate-70 over U.S. 89; beginning of concrete pour West of Filmore, 15 Sep 1986
213Interstate-70 aerials North of Richfield, preconstruction, 29 Sep 1986
214Interstate-80 West, high water and erosion, I-80 at lake point before concrete laydown, 16 Apr 1986
215Interstate-80 West concrete overlay, Black Rock to 8 miles post Tooele Junction, deck repair, 13 Jun 1986, I-80 West, 18 Jun 1986
216Interstate-80 core sampling West, Wendover to Knolls, Nov 1986
117Mirror Lake Road (State Road 50) washout, 9 Jun 1986
217Parley's Canyon slide and road damage, plus repair, 10 Sep 1986, 18 Sep 1986, 26 Sep 1986
115Provo Canyon construction, Jul 10, 1985, Sep 9, 1985, Oct 29, 1985
218Provo Canyon, 12 Mar 1987, Thistle, 12 Mar 1987, Provo Canyon, 18 Mar 1987
219Provo Canyon, 8'pipe at wildwood, beginning of construction, 12 Mar 1987; Billies Mountain before big blast, 12 Mar 1987; Provo Canyon, large pipe, 18 Mar 1987.
220Recapture Wash dedication ceremony, 1986
115Salt Lake Valley aerials and slag on Great Salt Lake beaches, Sep 12, 1985
31State Road 65, realignment for Little Dell Reservoir, 18 Apr 1987
32Trapper's Loop locations, undated
33Trapper's Loop, three trips, undated
34Utah Highway 276, Clayhill Pass construction, Part I, 11 Mar-29 Apr, 1986
35Utah Highway 276, Clayhill Pass construction, part II, 29 Apr to 14 Jul 1986.
36Utah Highway 276, Clayhill Pass construction, part III, 14 Jul to 13 Sep 1986
37Utah Highway 276, Clayhill Pass, 13 Aug to13 Sep 1986.
38Utah Highway 276, Clayhill documentation, 14 Jul 1986, 21 Oct 1986
3987-003, West Desert pumping and dyking
31088-075, 88-076, I-215 construction
31188-079, 88-081, I-215 construction and Garfield interchange fatality
31288-080, 88-084, Garfield interchange
31388-082, I-80 Delle to Burmester
31488-083, I-80 Delle to Burmester
31588-085, Garfield interchange
31688-088, 88-089, Jordanelle
31788-090, Jordanelle, part 1
31888-090, 88-091, Jordanelle, part 2 and Jordanelle night construction
31988-095, aerials Jordanelle
32088-108, 88-111, Jordanelle SW
4188-112, Jordanelle NE
4288-113, Jordanelle SW
4388-114, 88-118, 88-119, Jordanelle, SW and Henifer structure
4488-125, Jordanelle NE
4588-126, Jordanelle NW
4688-127, Jordanelle SW
4788-128, Jordanelle SW
4888-132, I-70 Fremont Junction to Muddy Creek
4988-132, I-70 Fremont Junction to Muddy Creek
41088-133, I-70 Devils Canyon to Ghost Rocks
41188-134, I-70 Ghost Rocks to Rattlesnake Bench
41289-003, U.S. 89 Wall Street and Riverdale Road
41389-005, I-215
41489-018, State Road 14 slide area
41589-021, I-70 Devils Canyon to Ghost Rocks
41689-022, I-70 Ghost Rocks to Rattlesnake Bench
41789-020, 89-025, I-70 Fremont Junction to Muddy Creek and Devils Canyon
41889-020, 89-025, I-70 Fremont Junction to Muddy Creek and Devils Canyon
41989-025, I-70 Fremont Junction to Muddy Creek
42089-021, 89-026, Eagle Canyon structure
5189-029, 89-030, Jordanelle NE
5289-051, Jordanelle NW
5389-053, Jordanelle SW
5489-054, Jordanelle SW
5589-055, Jordanelle SW
5689-057, Jordanelle NE
5789-059, 89-060, I-70 Sigard to Richfield and State Road 14
5889-061, State Road 24 and San Rafael River Bridge
5989-062, I-70 Rattlesnake to Ghost Rocks
51089-063, I-70 Eagle Canyon structure
51189-065, 89-066, I-70 Ghost Rocks to Devils Canyon
51289-068, I-70 Fremont Junction to Muddy Creek
51389-070, U.S. 40 to Dead Man's Gulch
51489-073, 89-073, I-215
51589-074, Jordanelle NE
51689-078, I-70 Richfield to Sigard
51789-079, I-70 Muddy River to Fremont
51889-080, I-70 Eagle Canyon
51989-081, I-70 Rattlesnake to Ghost Rocks
52089-086, I-15 concrete slurry
6189-086, I-15 concrete slurry rehabilitation
6289-088, I-15 concrete slurry
6389-089, I-15 concrete slurry (preparing lanes for syncrete application)
6489-091, I-15 syncrete laydown
6589-092, I-15 syncrete
6689-093, I-15 concrete slurry rehabilitation
6789-094, I-15 syncrete laydown
6889-095, syncrete laydown
6989-096, syncrete laydown machine
61089-097, lane being prepared for syncrete laydown
61189-098, modified and reassembled syncrete laydown paving machine
61289-099, syncrete problems and making modifications
61389-100, syncrete
61489-101, 89-102, syncrete
61589-103, 89-104, syncrete, Ideal Cement Co. plant mixing special syncrete mix
61689-105, syncrete damage, patching and rutting
61789-106, syncrete laydown
61889-107, Trappers Loop
61989-108, bonding factors in syncrete, part 1
62089-108, bonding factors in syncrete, part 2
7189-109, I-15 syncrete, run through entire project
7289-110, I-15 syncrete, breaking and clearing off outside lane
7389-112, 89-115, I-15 syncrete, all three lanes
7489-116, I-15 syncrete, continued problems
7589-117, I-15 syncrete, Union Pacific Resources
7689-119, seibulite
7789-121, Risk management, Lupe Tavarez home
7889-122, Risk management, Richard Ross home
7989-123, Risk management, Steve Herrara home
71089-124, Risk management, Harold T. Olsen home
71189-125, Risk management, Mrs. Kooyman home
71289-126, Risk management, Edward T. Price home
71389-127, Risk management, Dean Collins home
71489-128, Risk management, Norma Vance home
71589-129, 89-130, Risk management, LeRoy T. Parkin & Arden Lubeck homes
71689-132, Syncrete test section
71789-133, Risk management, Ethel Hansen home
71890-001, Risk management, Ron Brummer home
71990-002, Risk management, Ron Brummer duplex
72090-003, Risk management, Johanna Atkinson home
8190-004, syncrete, closure of inside lane
8290-005, syncrete, closing lanes for tests
8390-006, syncrete video (compiled from previous videos)
8490-007, TV news clips about syncrete
8590-011, syncrete removal
8690-013, syncrete removal plus settling ponds
8790-014, I-215 and Big Cottonwood diagonal
8890-016, Jordanelle NE
8990-017, I-15 Wildcat to Millard County line
81090-018, I-70 Fremont Junction to Muddy River, part 1
81190-018, I-70 Fremont Junction to Muddy River, part 2
81290-019, I-70 Devils Canyon to Ghost Rocks
81390-020, I-70 Devils Canyon to Ghost Rocks
81490-021, I-70 Eagle Canyon structure
81590-022, 90-023, State Road 313 Island in the Sky to Dubinky and Dubinky to U.S. 191
81690-024, I-70 Fremont Junction to Muddy River
81790-028, Jordanelle NE
81890-029, I-215 noise wall
81990-030, syncrete all ground off and textured
82090-031, Hilltop to Utah County line
9190-031, I-15 Tremonton to Plymouth
9290-032, I-15 Salt Creek Interchange, Nephi
9390-033, State Road 21 Nevada line to Cedar Pass
9490-034, I-15 Wildcat to Millard County line
9590-035, I-15 Tremonton to Plymouth
9690-036, Jordanelle NE
9790-037, I-80 Navajo to I-15
9890-038, I-80 structures, Redwood Road to I-15
9990-039, Califronia Avenue and Redwood Road
91090-040, State Road 313 Dubinky Road to U.S. 191, part 1
91190-040, State Road 313 Dubinky Road to U.S. 191, part 2
91290-041, State Rod 313 Island in the Sky to Dubinky Road
91390-042, I-15 Wildcat to Millard County line
91490-043, I-70 Eagle Canyon structure
91590-044, I-70 Ghost Rocks to Devils Canyon
91690-045, I-15 Salt Creek Interchange, Nephi
91790-046, 5400 South
91890-047, Foothill Boulevard to Sunnyside Avenue
91990-049, flash flood damage I-15 Plymouth to Tremonton
92090-050, State Road 313 Dubinky Road to U.S. 191
10190-051, State Road 313
10290-052, 90-053, I-70 Ghost Rocks to Devils Canyon, Eagle Canyon
10390-058, U.S. 40 Starvation to Tabby Junction
10490-060, I-15 Tremonton to Plymouth
10590-062, Foothill Drive to Sunnyside Avenue
10690-063, West Valley Highway
10790-064, I-80 structures Salt Lake City
10890-065, I-15 Tremonton to Plymouth
10990-066, I-15 Tremonton to Plymouth
101090-067, I-15 St. George super port
101190-068, I-70 Saleratus Wash to Green River
101290-069, San Rafael River Bridge
101390-071, I-15 Tremonton to Plymouth
101490-072, I-15 Tremonton to Plymouth
101590-073, I-15 Tremonton to Plymouth
101690-075, I-15 Tremonton to Plymouth
101790-078, State Road 92, American Fork Canyon
101890-080, U.S. 189 Park City Junction to Browns Canyon
102090-081, I-70 Saleratus Wash to Green River, part 1
11190-081, I-70 Saleratus Wash to Green River, part 2
11290-082, I-15 St. George super port
11390-083, San Rafael River Bridge
11490-084, American Fork Canyon
11590-085, I-80 and 7200 West structure repair
11690-086, I-80 Knolls to Low
11790-087, U.S. 191 Park City Jct to Brown's Canyon
11890-088, I-80 and 7200 West damaged structure repair
11990-091, 7200 West and I-80 Knolls to Low
111090-092, West Valley Highway
111190-093, 7200 West and I-80
111290-094, I-15 St. George super port
111390-095, San Rafael River Bridge
111491-001, hydro-blasting
111591-002, 7200 West and I-80 structure damage repair
111691-003, 7200 West and I-80
111791-004, 7200 West and I-80 structure repair
111891-005, San Rafael River Bridge
111991-006, State Road 313 U.S. 191 to Dubinky and Dubinky to Island in the Sky
112091-009, St. George super port
12191-010, Ash Creek structures Toquerville
12291-011, San Rafael River structure
12391-022, 9400 South and 13th East intersection
12491-024, Jordanelle NE
12591-027, Castle Gate slope repair
12691-029, Jordanelle North
12791-031, Jordanelle West
12891-032, I-80 Knolls to Low
12991-033, Lemon's Dugway
121091-034, West Valley Highway
121191-035, West Valley Highway
121291-036, American Fork Canyon Road
121391-037, West Valley Highway
121491-038, West Valley Highway
121591-042, Jordanelle West
121691-043, Jordanelle East
121791-050, Lemon's Dugway
121891-053, Eagle Canyon structures from bottom of Eagle Canyon
121991-080, I-215 landscaping
122091-081, I-215 landscaping
13191-087, Washington Boulevard, Ogden
13291-095, Jordanelle West
13391-105, Washington Boulevard, Ogden
13491-106, Lemon's Dugway
13591-109, US 6 West Price to East Price
13691-112, 91-113, 91-114, 91-115, St. George super port, I-15 resurfacing in Washington County, Coal Creek Structure, and State Road 14 slide area
13791-116, West Valley Highway
13891-117, West Valley Highway
13991-118, West Valley Highway
131091-119, Black Rock Interchange
131191-120, Jordanelle West
131291-121, West Valley Highway
131391-122, 91-123, 91-124, I-15 Provo to Spanish Fork, Soldier Summit, and Castle Gate slope repair
131491-127, Provo Canyon
131591-128, Provo Canyon
131691-135, Provo Canyon
131791-136, I-215 landscaping
131891-137, Provo Canyon
131991-139, West Valley Highway
132091-140, Black Rock Interchange
14191-144, I-215 landscaping
14291-145, Washington Boulevard, Ogden
14391-146, Jordanelle North
14491-147, Lemon's Dugway
14591-148, Provo Canyon
14691-149, Provo Canyon
14792-004, I-215 landscaping
14892-005, State Street structure across I-15
14992-006, I-15 and State Street structure
141092-007, I-15 and State Street structure
141192-008, I-215 landscaping
141292-032, 92-033, Provo Canyon
141392-034, 92-035, I-15 and State Street, I-215 landscaping
141492-037, 92-039, 92-040, Washington Boulevard, Ogden, Ogden River Bridge
141592-038, I-215 landscaping, part 1
141692-038, I-215 landscaping, part 2
141792-041, I-215 landscaping
141892-042, Washington Boulevard, Ogden River Structure
141992-044, Washington Boulevard and demolition of Provo River Structure
142092-050, Washington Boulevard, Odgen
15192-054, U.S. 89 Thistle
15292-055, 92-056, State Road 31 Huntington Canyon
15392-057, U.S. 191 Shirtail to Recapture Wash Dam
15492-058, I-70 night shots, part 1
15592-058, I-70 day shots, part 2
15692-059, I-15 Cedar City to Hamilton Fort, part 1
15792-059, I-15 Cedar City to Hamilton Fort, part 2
15892-061, Virgin River Bridge construction at Quail Creek
15992-062, 92-063, St. George super port and interchange
151092-064, U. 12 Dalton to Grafton
151192-065, Washington Bouldvard River Structure
151292-066, Washington Boulevard, Ogden
151392-068, Provo Canyon
151492-069, 92-070, West Valley Highway
151592-071, West Valley Highway
151692-072, 92-073, Black Rock Interchange and I-80 Tooele area
151792-073, 92-074, State Road 31 Huntington Canyon
151892-075, I-70 Rattlesnake Bench to San Rafael River, Spotted Wolf Canyon
151992-077, U.S. 191 Recapture Dam to Shirtail Junction
152092-079, State Road 12 Dalton to Grafton
16192-080, State Road 9 Virgin River structure Quail Creek
16292-081, I-15 Cedar City to Hamilton Fort
16392-082, U.S. 89 Ephriam Main Street
16492-086, State Road 136 Vernon to Juab County line
16592-089, I-80 Tooele interchange to Burmester
16692-092, 92-093, Washington Boulevard and Odgen River Bridge
16792-094, State Road 36 Vernon to Juab County line
16892-095, Provo Canyon
16992-099, State Road 31 Fish Creek to forest boundary
161092-100, State Road 31 Fish Creek to Huntington
161192-101, U.S. 191 Recapture to Shirtail Junction
161292-102, I-70 Rattlesnake Bench to Saleratus Wash
161392-104, State Road 9 Virgin River Bridge at Quail Creek
161492-108, West Valley Highway
161592-113, 92-115, State Road 36 Vernon to Juab County line
161692-119, U.S. 89 Ephriam Main Street
161792-120, 92-121, State Road 31 Huntington Canyon
161892-123, 92-124, State Road 31 Huntington Canyon
161992-125, State Road 14 slide area
162092-127, Virgin River structure
17192-128, Sate Road 9 Dalton Wash to Grafton
17292-144, Washington Boulevard, Ogden
17392-145, State Road 31 Huntington Canyon
17492-146, State Road 31 Huntington Canyon
17592-148, I-70 Rattlesnake Bench to Saleratus Wash
17692-149, State Road 14 blasting
17792-150, State Road 9 Virgin River structure at Quail Creek
17892-151, State Road 9 Dalton Wash to Grafton
17992-156, D-Road Presentation, tape 1-A
171092-156, D-Road Presentation, tape 2-A
171192-156, D-Road Presentation, tape 1-B
171292-156, D-Road Presentation, tape 2-B
171393-016, I-215 landscaping
171493-020, I-215 landscaping, part A
171593-020, I-215 landscaping, part B
171693-021, I-215 landscaping
171793-027, I-215 landscaping
171893-030, State Road 31 Fish Creek to forest boundary
171993-039, State Road 31 Huntington Canyon
172093-133, I-215 landscaping, part 1
18193-133, I-215 landscaping, part 2
18295-093, State Road 36
18395-101, Big Dolores River trip
19-34N/Aunevaluated reel to reel tapes