Series 10263
Governor's Office of Management and Budget Superconducting super collider task force records, 1984-1987.
7.00 cubic feet
These records are housed in the Utah State Archives' permanent storage room.
Historical Note
See history of the records' creator.
Summary of Records
Scope and Content
In December 1983 the National Reference Designs Study first envisioned the potential construction of a superconducting super collider. The idea was reviewed by the U.S. Department of Energy (DOE) and a site-selection process for the construction of the world's largest super collider was initiated in 1987. The design of a super collider allows for two proton beams to be aimed at one another. Moving at near the speed of light, the particles in these beams smash into one another and are broken down to the most basic subatomic particle units. In this way conditions that may have appeared moments after the Big Bang are replicated and scientists are able to learn about the basic forces governing the laws of physics.
Utah leaders saw the SSC as a potentially powerful means to spur social and economic growth in the Wasatch Front region, and determined that the state would make a formal proposal to the DOE for construction of the Superconducting Super Collider (SSC) in Utah's Great BasinDesert. The estimated construction cost of the SSC was projected at $600 million per year over a six or seven year period. Had it been built the SSC would have had a long-term construction for of 750 workers, and a peak construction force of approximately 4000. Upon completion the annual operating budget of the SSC would have totaled $270 million per year. The consulting firm of Dames and Moore was hired to conduct a site review and help draft the formal proposal that fit the site specific qualification criteria demanded by the official DOE Invitation for Site Proposals. Dames and Moore was assisted in the process by the Ralph M. Parsons Company, Roger Foott Associates, Inc., Bear West Consulting, the Wasatch Front Regional Council, and the Data Resources Section of the Utah Office of Planning and Budget.
SSC qualification criteria issued by the DOE reveal the massive energy and resource needs of the project. The design of the SSC called for a tube 10 feet in diameter to be buried 20feet below the ground surface (to shield above ground monitoring areas from radiation). This tube would have run 52 miles in an oval raceway (with dimensions of 17.4 miles by 14.6 miles). The above ground campus facilities were to be connected to the underground areas. It was in the above ground areas that monitoring and study could take place. A DOE estimate of 4000 acres was needed for the facility (with additional rights to another 4000 to 5000 acres for future tunneling). The power and water demands for the SSC and its off-site support facilities would have been equivalent to a town of 30,000. Utility requirements for the SSC included:
- Two independent commercial electrical sources at minimum 138 Kv (preferably in the range of the 230 Kv to 500 Kv) with peak demand of 250 MW.
- 2700 gpm peak water demand
- 100,000 gallons of sewage disposal per day
- 55,000 to 73,000 MBtu/hr of heating from natural gas, coal, oil, solar, or geothermal sources
- 4000 lines and 200 trunks fortelecommunications
- Radioactive waste disposal for low-level equipment and decommissioning of accelerator at the end of SSC operation
Additionally the SSC would have demanded infrastructure for an operational staff of 3000 (2500 permanent personnel and 500 visiting personnel). With families, it was estimated that approximately 10,000 people would have been directly dependent on available SSC facilities and infrastructure.
Two initial reports were created by Dames and Moore in February and March of 1987 that laid out the specifications of the SSC, as well as an initial assessment of areas in Utah that could prove feasible for SSC construction. Based on these reports, two areas in the Great Basin Desert were chosen for a more thorough review and assessment process. Ultimately two separate multi-volume proposals were created for the sites in question. The first is entitled the "Cedar Mountains Siting Proposal" and focuses on a region 52 miles west of Salt Lake City, near SkullValley. The second proposal is entitled the "Ripple Valley Siting Proposal" and focuses on an area 69 miles west of Salt Lake City (near the Knolls exit on Interstate 80). The reports generated for each site proposal focus on geology, local environment, public land availability, regional conditions, and available utilities and infrastructure. Each presents a formal offer by Utah to the DOE for construction rights to the SSC. This offer included access to public lands, utilities run to the SSC site at no charge, $230 million on SSC facilities (including a High Energy Research Institute with a $7.5 million annual budget), and support infrastructure in the form of roads, railroad sidings, and an aircraft landing strip. The formal siting reports were submitted to the DOE for review on September 02, 1987.
The records in this series were created by or at the request of the governor's Superconducting Super Collider (SSC) Task Force, which was staffed by the governor's science advisor andthe Office of Planning and Budget. Records document meetings of the task force, and studies and draft proposals recommending that the United State Department of Energy select Utah as the site for constructing the super collider. The records also include task force meeting agenda, minutes, and handouts; draft site proposals for Cedar Mountains and Ripple Valley; site comparisons; progress reports; copies of governor press releases, news articles, Department of Energy questions and answers, and other community relations information; and correspondence.
Ultimately the DOE rejected the Utah proposal for the SSC, instead awarding the project to Texas in November 1988. Construction on the SSC (nicknamed "Desertron") began in 1991 near the central-Texas town of Waxahachie. Seventeen shafts were sunk and 14.6 miles of tunnel were bored (out of an estimated 54.1 miles needed) before claims of government mismanagement and sky-rocketing costs ended construction in 1993. By the time constructionwas halted the federal government had spent $2 billion dollars on the SSC (with an estimated price tag of $12 billion to successfully finish it). The massive costs of the project were primarily associated with the extreme difficulties encountered with tunneling through bedrock and creating viable infrastructure deep underground. Had the SSC project been completed, its two 20 TeV per proton energy beams would have made it the largest super collider on Earth (even larger than the Large Hadron Collider that was built near Geneva, Switzerland and became operation in 2009). The SSC site in Waxahachie was deeded to Ellis County, Texas after construction was halted, and was eventually sold in 2006 to a private company which began marketing it as a data center. The site was purchased in 2012 by chemical company, Magnablend.
Arrangement
Chronological by date.
Access Restrictions
This series is classified as Public.
Use Restrictions
These records are available for reproduction and use.
Preferred Citation
Cite the Utah State Archives and Records Service, the creating agency name, the series title, and the series number.
Acquisition Information
These records were acquired from the creating agency through established retention schedules.
Processing Information
This series was processed by Jim Kichas in June 2012.
Related Material
Superconducting Super Collider proposal from the Utah Energy Office, Series 353, contains copies of all the official reports and submitted proposals related to Utah's bid for the Superconducting Super Collider.
Special project files from the Department of Natural Resources. Geological Survey, Series 25708, contains information collected or created by the Geological Survey about special projects, including the Superconducting Super Collider.
Superconducting super collider records from Board of Regents (Utah). University of Utah. Economic Business Research, Series 83904, contains additional copies of the proposal reports found in this series along with other technical information on the Superconducting Super Collider.
Indexing Terms
Container List
Box | Folder | Date | Description |
---|---|---|---|
1 | 1 | 1987 | Task Force Members for the Superconducting Super Collider |
1 | 2 | 1987 Aug 31 | Governor Norm Bangerter Press Conference on the Superconducting Super Collider Proposal Submission |
1 | 3 | 1987 Dec 29 | Press Release by Governor Norm Bangerter on Utah's Exclusion from the Superconducting Super Collider "Short List" |
1 | 4 | 1987 Dec 29 | Superconducting Super Collider "Short List" Report to Governor Bangerter from the National Academy of Science and the National Academy of Engineering |
1 | 5 | 1987 | Utah Superconducting Super Collider Task Force Monthly Bulletin |
1 | 6 | 1987 | Key Factors in Superconducting Super Collider Site Comparisons |
1 | 7 | 1987 | Miscellaneous Superconducting Super Collider Handouts |
1 | 8 | 1987-1988 | United States Air Force |
1 | 9 | 1987 | Superconducting Super Collider Site Proposal Document Delivery |
1 | 10 | 1987 | Superconducting Super Collider Information |
1 | 11 | 1987 | Superconducting Super Collider News Articles |
1 | 12 | 1987 | Superconducting Super Collider News Articles |
1 | 13 | 1983-1987 | Superconducting Super Collider Media Coverage |
1 | 14 | 1987 | Superconducting Super Collider Media Coverage |
1 | 15 | 1987 | Western Regional Coalition - Correspondence |
1 | 16 | 1987 May 14 | Western Regional Coalition - Minutes |
1 | 17 | 1987 May 14 | Western Regional Coalition - Addresses |
1 | 18 | 1987 | Western Regional Coalition - Letter Copies |
1 | 19 | 1987 May 14 | Western Regional Coalition - Meeting |
1 | 20 | 1987 May 14 | Western Regional Coalition - Resolution |
1 | 21 | 1987 May 14 | Western Regional Coalition - Addresses |
1 | 22 | 1987 | Superconducting Super Collider Correspondence |
1 | 23 | 1987 | Superconducting Super Collider Correspondence |
1 | 24 | 1985-1987 | Air Force Lands Documentation |
1 | 25 | 1987 Jul 21-Jul 22 | Superconducting Super Collider Red Team Review |
1 | 26 | 1987 Aug 10-Aug 11 | Superconducting Super Collider Blue Team Review |
1 | 27 | 1987 | Task Force Expenses, Authorizations, Memorandum, Etc. |
1 | 28 | 1987 Apr 29 | Pre-proposal Conference |
1 | 29 | 1987 | Superconducting Super Collider Land Acquisition Issues |
1 | 30 | 1987 Apr 29 | Department of Energy Proposal Conference - Addresses of Attendees |
1 | 31 | 1987 May 11 | Department of Energy Invitation for Site Proposals - Questions/Answers |
1 | 32 | 1987 Jun | Department of Energy Invitation for Site Proposals - Questions/Answers |
1 | 33 | 1987 Jul | Department of Energy Invitation for Site Proposals - Questions/Answers |
1 | 34 | 1987 | Questions to the Department of Energy after Pre-proposal Conference |
1 | 35 | 1987 | Department of Energy - Amendment 1 - Land Acquisition |
1 | 36 | 1987 | Department of Energy - Amendment 2 - Deadline Extension |
1 | 37 | 1987 Aug 3 | Department of Energy Information Packet - Q/A on Amendment 2; Congressional Record; FERMI and INEL Data; Nuclear Waste |
1 | 38 | 1987 | Business Committee |
1 | 39 | 1987 | Resolutions of Support |
1 | 40 | 1987 Jun 1 | Community Committee Meeting |
1 | 41 | 1987 | Community Committee |
1 | 42 | 1986-1987 | Education Committee |
1 | 43 | 1987 | June Bulletin |
1 | 44 | 1987 | July Bulletin |
1 | 45 | 1987 | August Bulletin |
1 | 46 | 1987 | Bilham Marketing, Advertising, and Public Relations Material |
1 | 47 | 1987 | Comments on Superconducting Super Collider Draft Proposals |
1 | 48 | 1987 | Comments on Superconducting Super Collider Draft Proposals |
1 | 49 | 1987 | Comments on Superconducting Super Collider Draft Proposals |
1 | 50 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Ripple Valley |
1 | 51 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains |
1 | 52 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Ripple Valley |
1 | 53 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Ripple Valley - Volume 3 |
1 | 54 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains - Volume 3 |
1 | 55 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains - Volume 4 |
1 | 56 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Ripple Valley - Volume 4 |
1 | 57 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Ripple Valley - Volume 5 |
1 | 58 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains - Volume 5 |
1 | 59 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Ripple Valley - Volume 6 |
1 | 60 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains - Volume 6 |
1 | 61 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Volume 7 |
1 | 62 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains - Volume 7 |
1 | 63 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Ripple Valley - Volume 8 |
1 | 64 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains - Volume 8 |
1 | 65 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Ripple Valley Geotechnical Report |
1 | 66 | 1987 | Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains Geotechnical Report |
2 | 1 | 1987 | Superconducting Super Collider Technical Review Minutes |
2 | 2 | 1986 | Superconducting Super Collider Technical Review Minutes |
2 | 3 | 1985 | Superconducting Super Collider Technical Review Minutes |
2 | 4 | 1987 | Superconducting Super Collider - To the Heart of the Matter |
2 | 5 | 1987 | Utah Superconducting Super Collider Task Force Records |
2 | 6 | 1987 | Superconducting Super Collider Siting Information |
2 | 7 | 1987 Mar 24 | Technical Review Committee Meeting Minutes |
2 | 8 | 1987 | Superconducting Super Collider Technical Review Committee - Ron Bell Letters |
2 | 9 | 1987 Mar 24 | Technical Review Committee Meeting Minutes |
2 | 10 | 1987 | Dames and Moore - Superconducting Super Collider Feasibility Checklist |
2 | 11 | 1987 Apr 14 | Technical Review Committee Meeting Minutes |
2 | 12 | 1987 Apr 14 | Superconducting Super Collider Technical Review Minutes |
2 | 13 | 1987 May 5 | Superconducting Super Collider Technical Review Minutes |
2 | 14 | 1987 May 5 | Superconducting Super Collider Technical Review Minutes |
2 | 15 | 1987 May 18 | Superconducting Super Collider Technical Review Minutes |
2 | 16 | 1987 May 18 | Superconducting Super Collider Technical Review Minutes |
2 | 17 | 1987 May 28 | Dames and Moore Briefing Document - Recommendation on Site Selection |
2 | 18 | 1987 Jun 2 | Technical Review Committee Meeting Minutes |
2 | 19 | 1987 Jun 2 | Technical Review Committee Meeting Minutes |
2 | 20 | 1987 Jun 16 | Technical Review Committee Meeting Minutes |
2 | 21 | 1987 Jun 16 | Technical Review Committee Meeting Minutes |
2 | 22 | 1987 | Dames and Moore - Revised ROM Cost Estimates for Offsite Superconducting Super Collider Infrastructure |
2 | 23 | 1987 Jun 30 | Technical Review Committee Meeting Minutes |
2 | 24 | 1987 Jul 14 | Technical Review Committee Meeting Minutes |
2 | 25 | 1987 Jul 14 | Technical Review Committee Meeting Minutes |
2 | 26 | 1987 Jul 21 | Technical Review Committee Meeting Minutes |
2 | 27 | 1987 Jul 21 | Technical Review Committee Meeting Minutes |
2 | 28 | 1987 Aug 4 | Technical Review Committee Meeting Minutes |
2 | 29 | 1987 Aug 4 | Technical Review Committee Meeting Minutes |
2 | 30 | 1987 Aug 18 | Technical Review Committee Meeting Minutes |
2 | 31 | 1987 Aug 18 | Technical Review Committee Meeting Minutes |
2 | 32 | 1987 | Universities Research Association - To the Heart of the Matter |
2 | 33 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 1: Executive Summary |
2 | 34 | 1987 Sep 2 | Superconducting Super Collider - Ripple Valley Siting Proposal - Volume 1: Executive Summary |
2 | 35 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 2: Offer, Financial and Other Incentives, and Other Documents |
2 | 36 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 3: Geology and Tunneling |
2 | 37 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 4: Regional Resources |
2 | 38 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 6: Setting |
2 | 39 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 7: Regional Conditions |
2 | 40 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 8: Utilities |
2 | 41 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Proposal Appendix B: Regional Resources Support Data |
3 | 1 | 1987 Aug 5 | Superconducting Super Collider Proposals - Cedar Mountains - Volume 1 (Draft) |
3 | 2 | 1987 | Superconducting Super Collider Proposals - Cedar Mountains - Volume 1 |
3 | 3 | 1987 | Superconducting Super Collider Proposals - Cedar Mountains/Ripple Valley - Volume 2 |
3 | 4 | 1987 Jun 12 | Superconducting Super Collider Proposals - Volume IV-Site B1 Draft |
3 | 5 | 1987 | Superconducting Super Collider - Cedar Mountains - Volume 8: Utilities (First Draft) |
3 | 6 | 1987 Aug 5 | Superconducting Super Collider - Ripple Valley - Volume 1 (Draft) |
3 | 7 | 1987 | Superconducting Super Collider - Cedar Mountains - Volume 8: Utilities (First Draft) |
3 | 8 | 1986 Jul 10 | Superconducting Super Collider Update - Science Council |
3 | 9 | 1985 Aug 27-Sep 25 | Superconducting Super Collider Task Force Minutes |
3 | 10 | 1984 Nov | Superconducting Super Collider Progress Report |
3 | 11 | 1985-1987 | Superconducting Super Collider Meetings |
3 | 12 | 1987 Apr 29 | Superconducting Super Collider Pre-proposal Conference |
3 | 13 | 1987 Apr | Department of Energy Invitation for Site Proposals for the Superconducting Super Collider |
3 | 14 | 1987 Apr 29 | Superconducting Super Collider Pre-proposal Conference |
3 | 15 | 1987 | Superconducting Super Collider Resources - Community |
3 | 16 | 1987 | Superconducting Super Collider Resources - Technical and Environmental |
3 | 17 | 1987 | Superconducting Super Collider Resources - Education |
3 | 18 | 1987 | Superconducting Super Collider Resources - Utilities |
3 | 19 | 1987 | Contract Agreement with Shipley |
3 | 20 | 1987 | Contract Agreement with the Department of Community and Economic Development |
3 | 21 | 1987 | Expenditures |
3 | 22 | 1984 | 1984 Site Proposal Studies |
3 | 23 | 1985 | Contracts |
3 | 24 | 1985 | Superconducting Super Collider Basic Information |
3 | 25 | 1984 | Dames and Moore |
3 | 26 | 1985-1987 | Dames and Moore - Superconducting Super Collider Study and Proposal |
3 | 27 | 1985 Aug | Morrison Knudsen Engineers - Services for Utah's Site Proposal to the Department of Energy for the Superconducting Super Collider |
3 | 28 | 1987 Feb 27 | Governor Norm Bangerter's Press Conference |
3 | 29 | 1987 | Bombing Sites - Hill Air Force Base |
3 | 30 | 1987 Mar 20 | Superconducting Super Collider Task Force Meeting |
3 | 31 | 1987 Mar 20 | Superconducting Super Collider Task Force Meeting Minutes |
3 | 32 | 1987 Mar 24 | Superconducting Super Collider Task Force Meeting Minutes |
3 | 33 | 1987 Apr 20 | Superconducting Super Collider Task Force Meeting |
3 | 34 | 1987 Apr 20 | Superconducting Super Collider Task Force Meeting |
3 | 35 | 1987 | Superconducting Super Collider Task Force - Letter Copies |
3 | 36 | 1987 May 18 | Superconducting Super Collider Task Force Meeting |
3 | 37 | 1987 May 18 | Superconducting Super Collider Task Force Meeting Minutes |
3 | 38 | 1987 | Site Comparison |
3 | 39 | 1987 Jun 18 | Superconducting Super Collider Task Force Meeting |
3 | 40 | 1987 Jun 18 | Superconducting Super Collider Task Force Meeting Minutes |
3 | 41 | 1987 Jun 18 | Superconducting Super Collider Task Force Handouts |
3 | 42 | 1987 Jul 22 | Superconducting Super Collider Task Force Meeting |
3 | 43 | 1987 Aug 19 | Superconducting Super Collider Task Force Meeting |
3 | 44 | 1987 Aug 19 | Superconducting Super Collider Task Force Meeting Minutes |
3 | 45 | 1987 Aug 19 | Superconducting Super Collider Task Force Handouts |
4 | 1 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Proposal Appendix A: Geotechnical Report Volume 1 |
4 | 2 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 2: The Offer |
4 | 3 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Proposal Appendix A: Geotechnical Report Volume II |
4 | 4 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Proposal Appendix A: Geotechnical Report Volume II |
4 | 5 | 1987 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 3: Maps |
4 | 6 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 3: Geology and Tunneling |
4 | 7 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 4: Proposal Appendix B: Regional Resources |
4 | 8 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 5: Maps |
4 | 9 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 5: Environment |
4 | 10 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 5: Appendix D - Cultural Resources |
4 | 11 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 6: Setting |
4 | 12 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 7: Regional Conditions |
4 | 13 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 8: Utilities |
4 | 14 | 1987 Sep 2 | Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 1: Geotechnical Report |
4 | 15 | 1987 Sep 2 | Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Proposal Appendix A: Geotechnical Report - Volume 1 |
4 | 16 | 1987 Sep 2 | Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Proposal Appendix A: Geotechnical Report - Volume 2 |
4 | 17 | 1987 Sep 2 | Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Proposal Appendix A: Geotechnical Report - Volume 2 |
4 | 18 | 1987 Sep 2 | Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Volume 2: The Offer |
4 | 19 | 1987 Jul 31 | Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Volume 4: Proposal Appendix B - Regional Resources |
4 | 20 | 1987 Sep 2 | Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Volume 5: Environment |
4 | 21 | 1987 Sep 2 | Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Volume 6: Setting |
4 | 22 | 1987 Sep 2 | Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Volume 7: Regional Conditions |
4 | 23 | 1987 Sep 2 | Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Volume 8: Utilities |
5 | 1 | 1987 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 1: Geotechnical Report (Volume 1) |
5 | 2 | 1987 | Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 2: Geotechnical Report (Volume 2) |
5 | 3 | 1987 | Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 3: Geology and Tunneling |
5 | 4 | 1987 | Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 4: Regional Resources |
5 | 5 | 1987 | Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 4: Regional Resources (2nd Draft) |
5 | 6 | 1987 | Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Appendix: Partial List of Federal Policies Affecting SSC Siting and Operation |
5 | 7 | 1987 Aug 3 | Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 5: Environment (1st Draft) |
5 | 8 | 1987 Aug 3 | Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 6: Setting |
5 | 9 | 1987 Aug 3 | Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 7: Regional Conditions |
5 | 10 | 1987 Aug 3 | Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 8: Utilities |
5 | 11 | 1987 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 3: Geology and Tunneling (1st Draft) |
5 | 12 | 1987 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 3: Geology and Tunneling |
5 | 13 | 1987 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Geotechnical Report (1st Draft) |
5 | 14 | 1987 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 1: Geotechnical Report |
5 | 15 | 1987 Jul 31 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 4: Regional Resources (3rd Draft) |
5 | 16 | 1987 Jul 10 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 4: Regional Resources (2nd Draft) |
5 | 17 | 1987 Aug 3 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Appendix: Partial List of Federal Policies Affecting SSC Siting and Operations |
5 | 18 | 1987 Aug 3 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 5: Environment (1st Draft) |
5 | 19 | 1987 Aug 3 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 5: Environment |
5 | 20 | 1987 Aug 3 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 6: Setting |
5 | 21 | 1987 Aug 3 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 7: Regional Conditions (1st Draft) |
5 | 22 | 1987 Aug 3 | Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 8: Utilities (1st Draft) |
6 | 1 | 1987 | Superconducting Super Collider Siting Location Maps |
6 | 2 | 1987 | Superconducting Super Collider Diagram |
6 | 3 | 1987 Sep 2 | Superconducting Super Collider Ripple Valley Siting Proposal - Volume 1: Executive Summary |
6 | 4 | 1987 Sep 2 | Superconducting Super Collider Ripple Valley Siting Proposal - Volume 2: Offer, Financial and Other Incentives, and Other Documents |
6 | 5 | 1987 Sep 2 | Superconducting Super Collider Ripple Valley Siting Proposal - Volume 3: Geology and Tunneling |
6 | 6 | 1987 Sep 2 | Superconducting Super Collider Ripple Valley Siting Proposal - Volume 4: Regional Resources |
6 | 7 | 1987 Sep 2 | Superconducting Super Collider Ripple Valley Siting Proposal - Volume 5: Environment |
6 | 8 | 1987 Sep 2 | Superconducting Super Collider Ripple Valley Siting Proposal - Volume 6: Setting |
6 | 9 | 1987 Sep 2 | Superconducting Super Collider Ripple Valley Siting Proposal - Volume 7: Regional Conditions |
6 | 10 | 1987 Sep 2 | Superconducting Super Collider Ripple Valley Siting Proposal - Volume 8: Utilities |
6 | 11 | 1987 Sep 2 | Superconducting Super Collider Ripple Valley Siting Proposal - Proposal Appendix A: Geotechnical Report (Volume 1) |
6 | 12 | 1987 | Superconducting Super Collider Ripple Valley Siting Proposal - Proposal Appendix A: Geotechnical Report (Volume 2) |
6 | 13 | 1987 | Superconducting Super Collider Ripple Valley Siting Proposal - Proposal Appendix A: Geotechnical Report (Volume 2) |
6 | 14 | 1987 | Superconducting Super Collider Ripple Valley Siting Proposal - Proposal Appendix B: Regional Resources Support Data |
7 | 1 | 1987 Sep 2 | Superconducting Super Collider - Conceptual Design |
7 | 2 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 2: Offer, Financial and Other Incentives, and Other Documents |
7 | 3 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 3: Geology and Tunneling |
7 | 4 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 4: Regional Resources |
7 | 5 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 6: Setting |
7 | 6 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 7: Regional Conditions |
7 | 7 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 8: Proposal Appendix A: Geotechnical Report (Volume 1) |
7 | 8 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Proposal Appendix A: Geotechnical Report (Volume 1) |
7 | 9 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Proposal Appendix A: Geotechnical Report (Volume 2) |
7 | 10 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Proposal Appendix A: Geotechnical Report (Volume 2) |
7 | 11 | 1987 Sep 2 | Superconducting Super Collider - Cedar Mountains Siting Proposal - Proposal Appendix B: Regional Resources Support Data |