In December 1983 the National Reference Designs Study first envisioned the potential construction of a superconducting super collider. The idea was reviewed by the U.S. Department of Energy (DOE) and a site-selection process for the construction of the world's largest super collider was initiated in 1987. Utah leaders saw the SSC as a potentially powerful means to spur social and economic growth in the Wasatch Front region, and determined that the state would make a formal proposal to the DOE for construction of the Superconducting Super Collider (SSC) in Utah's Great Basin Desert. These records were created by or at the request of the governor's SSC Task Force, which was staffed by the governor's science advisor and the Office of Planning and Budget. Records document meetings of the task force, and studies and draft proposals recommending that the United State Department of Energy select Utah as the site for constructing the super collider. The records also include task force meeting agenda, minutes, and handouts; draft site proposals for Cedar Mountains and Ripple Valley; site comparisons; progress reports; copies of governor press releases, news articles, Department of Energy questions and answers, and other community relations information; and correspondence.

Scope and Content

In December 1983 the National Reference Designs Study first envisioned the potential construction of a superconducting super collider. The idea was reviewed by the U.S. Department of Energy (DOE) and a site-selection process for the construction of the world's largest super collider was initiated in 1987. The design of a super collider allows for two proton beams to be aimed at one another. Moving at near the speed of light, the particles in these beams smash into one another and are broken down to the most basic subatomic particle units. In this way conditions that may have appeared moments after the Big Bang are replicated and scientists are able to learn about the basic forces governing the laws of physics.
Utah leaders saw the SSC as a potentially powerful means to spur social and economic growth in the Wasatch Front region, and determined that the state would make a formal proposal to the DOE for construction of the Superconducting Super Collider (SSC) in Utah's Great BasinDesert. The estimated construction cost of the SSC was projected at $600 million per year over a six or seven year period. Had it been built the SSC would have had a long-term construction for of 750 workers, and a peak construction force of approximately 4000. Upon completion the annual operating budget of the SSC would have totaled $270 million per year. The consulting firm of Dames and Moore was hired to conduct a site review and help draft the formal proposal that fit the site specific qualification criteria demanded by the official DOE Invitation for Site Proposals. Dames and Moore was assisted in the process by the Ralph M. Parsons Company, Roger Foott Associates, Inc., Bear West Consulting, the Wasatch Front Regional Council, and the Data Resources Section of the Utah Office of Planning and Budget.
SSC qualification criteria issued by the DOE reveal the massive energy and resource needs of the project. The design of the SSC called for a tube 10 feet in diameter to be buried 20feet below the ground surface (to shield above ground monitoring areas from radiation). This tube would have run 52 miles in an oval raceway (with dimensions of 17.4 miles by 14.6 miles). The above ground campus facilities were to be connected to the underground areas. It was in the above ground areas that monitoring and study could take place. A DOE estimate of 4000 acres was needed for the facility (with additional rights to another 4000 to 5000 acres for future tunneling). The power and water demands for the SSC and its off-site support facilities would have been equivalent to a town of 30,000. Utility requirements for the SSC included:
- Two independent commercial electrical sources at minimum 138 Kv (preferably in the range of the 230 Kv to 500 Kv) with peak demand of 250 MW.
- 2700 gpm peak water demand
- 100,000 gallons of sewage disposal per day
- 55,000 to 73,000 MBtu/hr of heating from natural gas, coal, oil, solar, or geothermal sources
- 4000 lines and 200 trunks fortelecommunications
- Radioactive waste disposal for low-level equipment and decommissioning of accelerator at the end of SSC operation
Additionally the SSC would have demanded infrastructure for an operational staff of 3000 (2500 permanent personnel and 500 visiting personnel). With families, it was estimated that approximately 10,000 people would have been directly dependent on available SSC facilities and infrastructure.
Two initial reports were created by Dames and Moore in February and March of 1987 that laid out the specifications of the SSC, as well as an initial assessment of areas in Utah that could prove feasible for SSC construction. Based on these reports, two areas in the Great Basin Desert were chosen for a more thorough review and assessment process. Ultimately two separate multi-volume proposals were created for the sites in question. The first is entitled the "Cedar Mountains Siting Proposal" and focuses on a region 52 miles west of Salt Lake City, near SkullValley. The second proposal is entitled the "Ripple Valley Siting Proposal" and focuses on an area 69 miles west of Salt Lake City (near the Knolls exit on Interstate 80). The reports generated for each site proposal focus on geology, local environment, public land availability, regional conditions, and available utilities and infrastructure. Each presents a formal offer by Utah to the DOE for construction rights to the SSC. This offer included access to public lands, utilities run to the SSC site at no charge, $230 million on SSC facilities (including a High Energy Research Institute with a $7.5 million annual budget), and support infrastructure in the form of roads, railroad sidings, and an aircraft landing strip. The formal siting reports were submitted to the DOE for review on September 02, 1987.
The records in this series were created by or at the request of the governor's Superconducting Super Collider (SSC) Task Force, which was staffed by the governor's science advisor andthe Office of Planning and Budget. Records document meetings of the task force, and studies and draft proposals recommending that the United State Department of Energy select Utah as the site for constructing the super collider. The records also include task force meeting agenda, minutes, and handouts; draft site proposals for Cedar Mountains and Ripple Valley; site comparisons; progress reports; copies of governor press releases, news articles, Department of Energy questions and answers, and other community relations information; and correspondence.
Ultimately the DOE rejected the Utah proposal for the SSC, instead awarding the project to Texas in November 1988. Construction on the SSC (nicknamed "Desertron") began in 1991 near the central-Texas town of Waxahachie. Seventeen shafts were sunk and 14.6 miles of tunnel were bored (out of an estimated 54.1 miles needed) before claims of government mismanagement and sky-rocketing costs ended construction in 1993. By the time constructionwas halted the federal government had spent $2 billion dollars on the SSC (with an estimated price tag of $12 billion to successfully finish it). The massive costs of the project were primarily associated with the extreme difficulties encountered with tunneling through bedrock and creating viable infrastructure deep underground. Had the SSC project been completed, its two 20 TeV per proton energy beams would have made it the largest super collider on Earth (even larger than the Large Hadron Collider that was built near Geneva, Switzerland and became operation in 2009). The SSC site in Waxahachie was deeded to Ellis County, Texas after construction was halted, and was eventually sold in 2006 to a private company which began marketing it as a data center. The site was purchased in 2012 by chemical company, Magnablend.

Arrangement

Chronological by date.

Access Restrictions

This series is classified as Public.

Use Restrictions

These records are available for reproduction and use.

Preferred Citation

Cite the Utah State Archives and Records Service, the creating agency name, the series title, and the series number.

Acquisition Information

These records were acquired from the creating agency through established retention schedules.

Processing Information

This series was processed by Jim Kichas in June 2012.

Related Material

Superconducting Super Collider proposal from the Utah Energy Office, Series 353, contains copies of all the official reports and submitted proposals related to Utah's bid for the Superconducting Super Collider.
Special project files from the Department of Natural Resources. Geological Survey, Series 25708, contains information collected or created by the Geological Survey about special projects, including the Superconducting Super Collider.
Superconducting super collider records from Board of Regents (Utah). University of Utah. Economic Business Research, Series 83904, contains additional copies of the proposal reports found in this series along with other technical information on the Superconducting Super Collider.

Indexing Terms

Container List

BoxFolderDateDescription
111987Task Force Members for the Superconducting Super Collider
121987 Aug 31Governor Norm Bangerter Press Conference on the Superconducting Super Collider Proposal Submission
131987 Dec 29Press Release by Governor Norm Bangerter on Utah's Exclusion from the Superconducting Super Collider "Short List"
141987 Dec 29Superconducting Super Collider "Short List" Report to Governor Bangerter from the National Academy of Science and the National Academy of Engineering
151987Utah Superconducting Super Collider Task Force Monthly Bulletin
161987Key Factors in Superconducting Super Collider Site Comparisons
171987Miscellaneous Superconducting Super Collider Handouts
181987-1988United States Air Force
191987Superconducting Super Collider Site Proposal Document Delivery
1101987Superconducting Super Collider Information
1111987Superconducting Super Collider News Articles
1121987Superconducting Super Collider News Articles
1131983-1987Superconducting Super Collider Media Coverage
1141987Superconducting Super Collider Media Coverage
1151987Western Regional Coalition - Correspondence
1161987 May 14Western Regional Coalition - Minutes
1171987 May 14Western Regional Coalition - Addresses
1181987Western Regional Coalition - Letter Copies
1191987 May 14Western Regional Coalition - Meeting
1201987 May 14Western Regional Coalition - Resolution
1211987 May 14Western Regional Coalition - Addresses
1221987Superconducting Super Collider Correspondence
1231987Superconducting Super Collider Correspondence
1241985-1987Air Force Lands Documentation
1251987 Jul 21-Jul 22Superconducting Super Collider Red Team Review
1261987 Aug 10-Aug 11Superconducting Super Collider Blue Team Review
1271987Task Force Expenses, Authorizations, Memorandum, Etc.
1281987 Apr 29Pre-proposal Conference
1291987Superconducting Super Collider Land Acquisition Issues
1301987 Apr 29Department of Energy Proposal Conference - Addresses of Attendees
1311987 May 11Department of Energy Invitation for Site Proposals - Questions/Answers
1321987 JunDepartment of Energy Invitation for Site Proposals - Questions/Answers
1331987 JulDepartment of Energy Invitation for Site Proposals - Questions/Answers
1341987Questions to the Department of Energy after Pre-proposal Conference
1351987Department of Energy - Amendment 1 - Land Acquisition
1361987Department of Energy - Amendment 2 - Deadline Extension
1371987 Aug 3Department of Energy Information Packet - Q/A on Amendment 2; Congressional Record; FERMI and INEL Data; Nuclear Waste
1381987Business Committee
1391987Resolutions of Support
1401987 Jun 1Community Committee Meeting
1411987Community Committee
1421986-1987Education Committee
1431987June Bulletin
1441987July Bulletin
1451987August Bulletin
1461987Bilham Marketing, Advertising, and Public Relations Material
1471987Comments on Superconducting Super Collider Draft Proposals
1481987Comments on Superconducting Super Collider Draft Proposals
1491987Comments on Superconducting Super Collider Draft Proposals
1501987Comments on Superconducting Super Collider Draft Proposals - Ripple Valley
1511987Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains
1521987Comments on Superconducting Super Collider Draft Proposals - Ripple Valley
1531987Comments on Superconducting Super Collider Draft Proposals - Ripple Valley - Volume 3
1541987Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains - Volume 3
1551987Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains - Volume 4
1561987Comments on Superconducting Super Collider Draft Proposals - Ripple Valley - Volume 4
1571987Comments on Superconducting Super Collider Draft Proposals - Ripple Valley - Volume 5
1581987Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains - Volume 5
1591987Comments on Superconducting Super Collider Draft Proposals - Ripple Valley - Volume 6
1601987Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains - Volume 6
1611987Comments on Superconducting Super Collider Draft Proposals - Volume 7
1621987Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains - Volume 7
1631987Comments on Superconducting Super Collider Draft Proposals - Ripple Valley - Volume 8
1641987Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains - Volume 8
1651987Comments on Superconducting Super Collider Draft Proposals - Ripple Valley Geotechnical Report
1661987Comments on Superconducting Super Collider Draft Proposals - Cedar Mountains Geotechnical Report
211987Superconducting Super Collider Technical Review Minutes
221986Superconducting Super Collider Technical Review Minutes
231985Superconducting Super Collider Technical Review Minutes
241987Superconducting Super Collider - To the Heart of the Matter
251987Utah Superconducting Super Collider Task Force Records
261987Superconducting Super Collider Siting Information
271987 Mar 24Technical Review Committee Meeting Minutes
281987Superconducting Super Collider Technical Review Committee - Ron Bell Letters
291987 Mar 24Technical Review Committee Meeting Minutes
2101987Dames and Moore - Superconducting Super Collider Feasibility Checklist
2111987 Apr 14Technical Review Committee Meeting Minutes
2121987 Apr 14Superconducting Super Collider Technical Review Minutes
2131987 May 5Superconducting Super Collider Technical Review Minutes
2141987 May 5Superconducting Super Collider Technical Review Minutes
2151987 May 18Superconducting Super Collider Technical Review Minutes
2161987 May 18Superconducting Super Collider Technical Review Minutes
2171987 May 28Dames and Moore Briefing Document - Recommendation on Site Selection
2181987 Jun 2Technical Review Committee Meeting Minutes
2191987 Jun 2Technical Review Committee Meeting Minutes
2201987 Jun 16Technical Review Committee Meeting Minutes
2211987 Jun 16Technical Review Committee Meeting Minutes
2221987Dames and Moore - Revised ROM Cost Estimates for Offsite Superconducting Super Collider Infrastructure
2231987 Jun 30Technical Review Committee Meeting Minutes
2241987 Jul 14Technical Review Committee Meeting Minutes
2251987 Jul 14Technical Review Committee Meeting Minutes
2261987 Jul 21Technical Review Committee Meeting Minutes
2271987 Jul 21Technical Review Committee Meeting Minutes
2281987 Aug 4Technical Review Committee Meeting Minutes
2291987 Aug 4Technical Review Committee Meeting Minutes
2301987 Aug 18Technical Review Committee Meeting Minutes
2311987 Aug 18Technical Review Committee Meeting Minutes
2321987Universities Research Association - To the Heart of the Matter
2331987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 1: Executive Summary
2341987 Sep 2Superconducting Super Collider - Ripple Valley Siting Proposal - Volume 1: Executive Summary
2351987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 2: Offer, Financial and Other Incentives, and Other Documents
2361987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 3: Geology and Tunneling
2371987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 4: Regional Resources
2381987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 6: Setting
2391987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 7: Regional Conditions
2401987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 8: Utilities
2411987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Proposal Appendix B: Regional Resources Support Data
311987 Aug 5Superconducting Super Collider Proposals - Cedar Mountains - Volume 1 (Draft)
321987Superconducting Super Collider Proposals - Cedar Mountains - Volume 1
331987Superconducting Super Collider Proposals - Cedar Mountains/Ripple Valley - Volume 2
341987 Jun 12Superconducting Super Collider Proposals - Volume IV-Site B1 Draft
351987Superconducting Super Collider - Cedar Mountains - Volume 8: Utilities (First Draft)
361987 Aug 5Superconducting Super Collider - Ripple Valley - Volume 1 (Draft)
371987Superconducting Super Collider - Cedar Mountains - Volume 8: Utilities (First Draft)
381986 Jul 10Superconducting Super Collider Update - Science Council
391985 Aug 27-Sep 25Superconducting Super Collider Task Force Minutes
3101984 NovSuperconducting Super Collider Progress Report
3111985-1987Superconducting Super Collider Meetings
3121987 Apr 29Superconducting Super Collider Pre-proposal Conference
3131987 AprDepartment of Energy Invitation for Site Proposals for the Superconducting Super Collider
3141987 Apr 29Superconducting Super Collider Pre-proposal Conference
3151987Superconducting Super Collider Resources - Community
3161987Superconducting Super Collider Resources - Technical and Environmental
3171987Superconducting Super Collider Resources - Education
3181987Superconducting Super Collider Resources - Utilities
3191987Contract Agreement with Shipley
3201987Contract Agreement with the Department of Community and Economic Development
3211987Expenditures
32219841984 Site Proposal Studies
3231985Contracts
3241985Superconducting Super Collider Basic Information
3251984Dames and Moore
3261985-1987Dames and Moore - Superconducting Super Collider Study and Proposal
3271985 AugMorrison Knudsen Engineers - Services for Utah's Site Proposal to the Department of Energy for the Superconducting Super Collider
3281987 Feb 27Governor Norm Bangerter's Press Conference
3291987Bombing Sites - Hill Air Force Base
3301987 Mar 20Superconducting Super Collider Task Force Meeting
3311987 Mar 20Superconducting Super Collider Task Force Meeting Minutes
3321987 Mar 24Superconducting Super Collider Task Force Meeting Minutes
3331987 Apr 20Superconducting Super Collider Task Force Meeting
3341987 Apr 20Superconducting Super Collider Task Force Meeting
3351987Superconducting Super Collider Task Force - Letter Copies
3361987 May 18Superconducting Super Collider Task Force Meeting
3371987 May 18Superconducting Super Collider Task Force Meeting Minutes
3381987Site Comparison
3391987 Jun 18Superconducting Super Collider Task Force Meeting
3401987 Jun 18Superconducting Super Collider Task Force Meeting Minutes
3411987 Jun 18Superconducting Super Collider Task Force Handouts
3421987 Jul 22Superconducting Super Collider Task Force Meeting
3431987 Aug 19Superconducting Super Collider Task Force Meeting
3441987 Aug 19Superconducting Super Collider Task Force Meeting Minutes
3451987 Aug 19Superconducting Super Collider Task Force Handouts
411987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Proposal Appendix A: Geotechnical Report Volume 1
421987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 2: The Offer
431987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Proposal Appendix A: Geotechnical Report Volume II
441987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Proposal Appendix A: Geotechnical Report Volume II
451987Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 3: Maps
461987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 3: Geology and Tunneling
471987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 4: Proposal Appendix B: Regional Resources
481987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 5: Maps
491987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 5: Environment
4101987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 5: Appendix D - Cultural Resources
4111987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 6: Setting
4121987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 7: Regional Conditions
4131987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 8: Utilities
4141987 Sep 2Superconducting Super Collider - Utah Cedar Mountains Siting Proposal Draft - Volume 1: Geotechnical Report
4151987 Sep 2Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Proposal Appendix A: Geotechnical Report - Volume 1
4161987 Sep 2Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Proposal Appendix A: Geotechnical Report - Volume 2
4171987 Sep 2Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Proposal Appendix A: Geotechnical Report - Volume 2
4181987 Sep 2Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Volume 2: The Offer
4191987 Jul 31Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Volume 4: Proposal Appendix B - Regional Resources
4201987 Sep 2Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Volume 5: Environment
4211987 Sep 2Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Volume 6: Setting
4221987 Sep 2Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Volume 7: Regional Conditions
4231987 Sep 2Superconducting Super Collider - Utah Ripple Valley Siting Proposal Draft - Volume 8: Utilities
511987Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 1: Geotechnical Report (Volume 1)
521987Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 2: Geotechnical Report (Volume 2)
531987Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 3: Geology and Tunneling
541987Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 4: Regional Resources
551987Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 4: Regional Resources (2nd Draft)
561987Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Appendix: Partial List of Federal Policies Affecting SSC Siting and Operation
571987 Aug 3Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 5: Environment (1st Draft)
581987 Aug 3Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 6: Setting
591987 Aug 3Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 7: Regional Conditions
5101987 Aug 3Superconducting Super Collider - Cedar Mountains Site Proposal Draft - Volume 8: Utilities
5111987Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 3: Geology and Tunneling (1st Draft)
5121987Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 3: Geology and Tunneling
5131987Superconducting Super Collider - Ripple Valley Site Proposal Draft - Geotechnical Report (1st Draft)
5141987Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 1: Geotechnical Report
5151987 Jul 31Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 4: Regional Resources (3rd Draft)
5161987 Jul 10Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 4: Regional Resources (2nd Draft)
5171987 Aug 3Superconducting Super Collider - Ripple Valley Site Proposal Draft - Appendix: Partial List of Federal Policies Affecting SSC Siting and Operations
5181987 Aug 3Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 5: Environment (1st Draft)
5191987 Aug 3Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 5: Environment
5201987 Aug 3Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 6: Setting
5211987 Aug 3Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 7: Regional Conditions (1st Draft)
5221987 Aug 3Superconducting Super Collider - Ripple Valley Site Proposal Draft - Volume 8: Utilities (1st Draft)
611987Superconducting Super Collider Siting Location Maps
621987Superconducting Super Collider Diagram
631987 Sep 2Superconducting Super Collider Ripple Valley Siting Proposal - Volume 1: Executive Summary
641987 Sep 2Superconducting Super Collider Ripple Valley Siting Proposal - Volume 2: Offer, Financial and Other Incentives, and Other Documents
651987 Sep 2Superconducting Super Collider Ripple Valley Siting Proposal - Volume 3: Geology and Tunneling
661987 Sep 2Superconducting Super Collider Ripple Valley Siting Proposal - Volume 4: Regional Resources
671987 Sep 2Superconducting Super Collider Ripple Valley Siting Proposal - Volume 5: Environment
681987 Sep 2Superconducting Super Collider Ripple Valley Siting Proposal - Volume 6: Setting
691987 Sep 2Superconducting Super Collider Ripple Valley Siting Proposal - Volume 7: Regional Conditions
6101987 Sep 2Superconducting Super Collider Ripple Valley Siting Proposal - Volume 8: Utilities
6111987 Sep 2Superconducting Super Collider Ripple Valley Siting Proposal - Proposal Appendix A: Geotechnical Report (Volume 1)
6121987Superconducting Super Collider Ripple Valley Siting Proposal - Proposal Appendix A: Geotechnical Report (Volume 2)
6131987Superconducting Super Collider Ripple Valley Siting Proposal - Proposal Appendix A: Geotechnical Report (Volume 2)
6141987Superconducting Super Collider Ripple Valley Siting Proposal - Proposal Appendix B: Regional Resources Support Data
711987 Sep 2Superconducting Super Collider - Conceptual Design
721987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 2: Offer, Financial and Other Incentives, and Other Documents
731987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 3: Geology and Tunneling
741987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 4: Regional Resources
751987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 6: Setting
761987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 7: Regional Conditions
771987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Volume 8: Proposal Appendix A: Geotechnical Report (Volume 1)
781987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Proposal Appendix A: Geotechnical Report (Volume 1)
791987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Proposal Appendix A: Geotechnical Report (Volume 2)
7101987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Proposal Appendix A: Geotechnical Report (Volume 2)
7111987 Sep 2Superconducting Super Collider - Cedar Mountains Siting Proposal - Proposal Appendix B: Regional Resources Support Data